United Kingdom Statutory Instruments


You are here: BAILII >> Databases >> United Kingdom Statutory Instruments >> The London Gateway Logistics and Commercial Centre Order 2007 No. 2657
URL: http://www.bailii.org/uk/legis/num_reg/2007/20072657.html

[New search] [Help]



STATUTORY INSTRUMENTS


2007 No. 2657

TRANSPORT AND WORKS, ENGLAND TRANSPORT ENGLAND

The London Gateway Logistics and Commercial Centre Order 2007

  Made 7th September 2007 
  Coming into force 28th September 2007 


CONTENTS


PART 1

PRELIMINARY
1. Citation and commencement
2. Interpretation
3. Application of the New Roads and Street Works Act 1991
4. Incorporation of the Railways Clauses Consolidation Act 1845

PART 2

WORKS PROVISIONS

Principal powers
5. Power to construct and maintain works
6. Power to deviate

Access to Works
7. Access to works

Supplemental
8. Discharge of water
9. Obstruction of construction of authorised works
10. Power to keep apparatus in streets
11. Power to execute street works
12. Temporary stopping up of streets
13. Agreement with street authorities

PART 3

OPERATION OF ATUHORISED WORKS
14. Power to operate and use authorised works
15. Maintenance of approved works, etc.
16. Trespass on authorised works
17. Power of disposal, agreements for operation, etc.
18. Agreements with Network Rail

PART 4

PROTECTIVE PROVISIONS
19. Part 1 of the Railways Act 1993
20. For the protection of Network Rail
21. For the protection of the Environment Agency

PART 5

MISCELLANEOUS AND GENERAL
22. Certification of plans, etc.
23. Service of notices
24. No double recovery
25. Arbitration
26. Defence to proceedings in respect of statutory nuisance
27. Planning permission and supplementary matters
28. Savings for regulated rights, etc.

SCHEDULES

  Schedule 1 — Scheduled works

  Schedule 2 — For the protection of Network Rail

  Schedule 3 — For the protection of the Environment Agency

An application has been made to the Secretary of State, in accordance with the Transport and Works (Application and Objections Procedure) (England and Wales) Rules 2000[
1] made under section 6, 6A, 7 and 10 of the Transport and Works Act 1992[2] ("the 1992 Act"), for an Order under sections 1 and 5 of the 1992 Act;

     The Secretary of State caused an inquiry to be held for the purposes of the application pursuant to section 11 of the 1992 Act;

     The Secretary of State having considered the objections made and not withdrawn, and the report of the person who held the inquiry, proposed to make an Order giving effect to the proposals comprised in the application with modifications which in his opinion made a substantial change in the proposals;

     Having considered representations duly made to him pursuant to section 13(4) of the 1992 Act, the Secretary of State has determined to make the Order as applied for with such modifications;

     Notice of the Secretary of State's determination was published in the London Gazette on 4th June 2007;

     Accordingly, the Secretary of State, in exercise of the powers conferred by sections 1 and 5 of, and paragraphs 1 to 5, 7, 8, 10, 11 and 15 to 17 of Schedule 1 to, the 1992 Act makes the following Order:—



PART 1

PRELIMINARY

Citation and commencement
     1. This Order may be cited as the London Gateway Logistics and Commercial Centre Order 2007 and shall come into force on 28th September 2007.

Interpretation
    
2. —(1) In this Order—

    (2) Any reference in this Order to a work identified by the number of the work shall be construed as a reference to the work of that number authorised by this Order.

    (3) All distances, directions and lengths stated in the description of the scheduled works or in any description of powers or lands shall be construed as if the works "or thereabouts" were inserted after each such distance, direction and length, and distances between points on a scheduled work shall be taken to be measured along that scheduled work.

Application of the New Roads and Street Works Act 1991
     3. —(1) Works executed under this Order in relation to a highway which consists of or includes a carriageway shall be treated for the purposes of Part 3 of the 1991 Act (street works) as major transport works if—

    (2) The provisions of the 1991 Act mentioned in paragraph (3) which, together with other provisions of that Act, apply in relation to the execution of street works and any regulations made or code of practice issued or approved under those provisions shall apply (with the necessary modifications) in relation to any stopping up, alteration or diversion of a street by the Promoter under the powers conferred by this Order whether or not the stopping up, alteration or diversion constitutes street works within the meaning of that Act.

    (3) The provisions of the 1991 Act referred to in paragraph (2) are—

all such other provisions as apply for the purposes of the provisions mentioned.

    (4) Sections 54 and 55 of the 1991 Act as applied by paragraph (2) shall have effect as if references in section 57 of that Act to emergency works were a reference to a stopping up, alteration or diversion (as the case may be) required in a case of emergency.

Incorporation of the Railways Clauses Consolidation Act 1845
    
4. —(1) The following provisions of the Railways Clauses Consolidation Act 1845[6] shall be incorporated in this Order—

    (2) In those provisions, as incorporated in this Order—

    (3) In section 46 of the said Act of 1845, as incorporated in this Order, for the proviso there shall be substituted the words "Provided always that, with the consent of the highway authority and subject to such conditions as the highway authority may reasonably impose, the railway may be carried across a highway on the level.".



PART 2

WORKS PROVISIONS

Principal powers

Power to construct and maintain works
     5. —(1) The Promoter may construct and maintain the scheduled works.

    (2) Subect to article 6 (power to deviate), the scheduled works may only be constructed in the lines or situations shown on the deposited plans and in accordance with the levels shown on the deposited sections.

    (3) Subject to paragraph (5), the Promoter may carry out and maintain such of the following works as may be necessary or expedient for the purposes of, or for purposes ancillary to, the construction of the scheduled works, namely—

    (4) Subject to paragraph (5), the Promoter may carry out and maintain such other works (of whatever nature) as may be necessary or expedient for the purposes of, or for purposes ancillary to, the construction of the scheduled works, other than works that would interfere with a navigable watercourse.

    (5) Paragraphs (3) and (4) shall only authorise the carrying out or maintenance of works within the limits of deviation shown on the deposited plans for the scheduled works.

Power to deviate
    
6. —(1) In constructing or maintaining any of the scheduled works, the Promoter may—

    (2) In constructing any work shown on the deposited plans as situated in a street and for which no limits of deviation are shown on those plans the Promoter may deviate laterally within the boundaries of that street.

Access to Works

Access to works
    
7. The Promoter may, for the purposes of the construction or operation of the scheduled works, form and lay out such means of access connecting to a public highway, within the limits of deviation, as may be approved by the highway authority, but such approval shall not be unreasonably withheld.

Supplemental

Discharge of water
    
8. —(1) The Promoter may use any watercourse or any public sewer or drain for the drainage of water in connection with the construction, operation or maintenance of the authorised works and for that purpose may law down, take up and alter pipes and may, on any land within the limits of deviation, make openings into, and connections with, the watercourse, public sewer or drain.

    (2) The Promoter shall not discharge any water into any watercourse, public sewer or drain except with the consent of the authority to which it belongs; and such consent may be given subject to such terms and conditions as the authority may reasonably impose but shall not be unreasonably withheld.

    (3) The Promoter shall not make any opening into any public sewer or drain except in accordance with plans approved by, and under the superintendence (if provided) of, the authority to which the sewer or drain belongs, but such approval shall not be unreasonably withheld.

    (4) The Promoter shall not, in the exercise of the powers conferred by this article, damage or interfere with the bed or banks of any watercourse forming part of the main river.

    (5) The Promoter shall take such steps as are reasonably practicable to secure that any water discharged into a watercourse or public sewer or drain under the powers conferred by this article is as free as may be practicable from gravel, soil or other solid substance or oil or matter in suspension.

    (6) This article does not authorise the entry into controlled waters of any matter whose entry or discharge into controlled waters is prohibited by section 85(1), (2) or (3) of the Water Resources Act 1991[
10].

    (7) In this article—

Obstruction of construction of authorised works
     9. Any person who, without reasonable excuse, obstructs another person from constructing any of the authorised works under the powers conferred by this Order shall be guilty of an offence and liable on summary conviction to a fine not exceeding level 3 on the standard scale.

Power to keep apparatus in streets
    
10. —(1) The Promoter may, for the purposes of or in connection with the construction, maintenance and use of the authorised works, place and maintain in any street within the limits of deviation any work, equipment or apparatus including, without prejudice to the generality of the foregoing, foundations, platforms, road islands, substations, electric lines and any electrical or other apparatus.

    (2) In this article—

Power to execute street works
    
11. The Promoter may, for the purposes of exercising the powers conferred by article 10 (power to keep apparatus in streets) and the other provisions of this Order, enter upon any street within the limits of deviation and may execute any works required for, or incidental to, the exercise of those powers including, without prejudice to the generality of the foregoing, breaking up or opening the street, or any sewer, drain or tunnel under it, or tunnelling or boring under the street.

Temporary stopping up of streets
    
12. —(1) The Promoter may, during and for the purposes of the execution of the authorised works, temporarily stop up, alter or divert any street and may for any reasonable time—

    (2) The Promoter shall provide reasonable access for pedestrians going to or from premises abutting a street affected by the exercise of the powers conferred by this article if there would otherwise by no such access.

    (3) Any person who suffers loss by the suspension of any private right of way under this article shall be entitled to compensation to be determined, in case of dispute, under Part 1 of the Land Compensation Act 1961[
11].

Agreement with street authorities
     13. —(1) A street authority and the Promoter may enter into agreements with respect to—

    (2) Such an agreement may, without prejudice to the generality of paragraph (1)—



PART 3

OPERATION OF AUTHORISED WORKS

Power to operate and use authorised works
    
14. The Promoter may operate and use the railway and other authorised works as a system, or part of a system, of transport for the carriage of goods.

Maintenance of approved works, etc.
    
15. —(1) Where, pursuant to regulations made under section 41 of the 1992 Act (approval of works, plant and equipment), approval has been obtained from the Office of Rail Regulation with respect to any works, plant or equipment (including vehicles) forming part of the authorised works, such works, plant and equipment shall not be used in a state or condition other than that in which they were at the time that the approval was given unless any change thereto does not materially impair the safe operation of the authorised works.

    (2) If without reasonable cause the provisions of paragraph (1) are contravened, the Promoter shall be guilty of an offence and liable on summary conviction to a fine not exceeding level 3 on the standard scale.

    (3) No proceedings shall be instituted in England and Wales in respect of an offence under this article except by or with the consent of the Office of Rail Regulation or the Director of Public Prosecutions.

Trespass on authorised works
    
16. Any person who—

shall be guilty of an offence and liable on summary conviction to a fine not exceeding level 3 on the standard scale.

Power of disposal, agreements for operation, etc.
    
17. —(1) The Promoter may sell, lease, charge or otherwise dispose of, on such terms and conditions as it thinks fit, the whole or any part of the authorised works and any land held in connection with the authorised works or the right to operate the works under this Order.

    (2) Without prejudice to the generality of paragraph (1), the Promoter may enter into and carry into effect agreements with respect to any of the following matters, namely, the construction, maintenance, use and operation of the authorised works, or any part of them, by any other person, and other matrters incidental or subsidiary thereto or consequential thereon, and the defraying of, or the making of contributions towards, the cost of the matters aforesaid by the Promoter or any other person.

    (3) Any agreement under paragraph (2) may provide (amongst other things) for the exercise of the powers of the Promoter in respect of the authorised works or any part of those works, and for the transfer to any person of the authorised works or any part of those works together with the rights and obligations of the Promoter in relation thereto.

    (4) The exercise of the powers of any enactment by any person in pursuance of any sale, lease, charge or disposal under paragraph (1), or any agreement under paragraph (2), shall be subject to the same restrictions, liabilities and obligtaions as would apply under this Order if those powers were exercised by the Promoter.

Agreements with Network Rail
    
18. —(1) Subject to Schedule 2 (for the protection of Network Rail), the Promoter and Network Rail may enter into and carry into effect agreements with respect to the construction, maintenance, use and operation of—

by Network Rail or by the Promoter, or by the Promoter and Network Rail jointly.

    (2) (a) Any agreement made under this article may contain such incidental, consequential or supplementary provisions as may be so agreed, including (but without prejudice to the generality of the foregoing) provisions—

    (3) The Promoter and Network Rail may enter into, and carry into effect, agreements for the transfer to and vesting in Network Rail or the Promoter, or the Promoter and Network Rail jointly, of—

together with any rights and obligations (whether or not statutory) of Network Rail or the Promoter relating thereto.

    (4) In this article—



PART 4

PROTECTIVE PROVISIONS

Part 1 of the Railways Act 1993
    
19. Nothing in this Order or in any enactment incorporated with or applied by this Order shall prejudice or affect the operation of Part 1 of the Railways Act 1993[12].

For the protection of Network Rail
     20. The provisions of Schedule 2 (for the protection of Network Rail) shall have effect.

For the protection of the Environment Agency
    
21. The provisions of Schedule 3 (for the protection of the Environment Agency) shall have effect.



PART 5

MISCELLANEOUS AND GENERAL

Certification of plans, etc.
    
22. The Promoter shall, as soon as practicable after the making of this Order, submit copies of the deposited plans and the deposited sections to the Secretary of State for certification that they are true copies of, respectively, the deposited plans and the deposited sections referred to in this Order, and a document so certified shall be admissible in any proceedings as evidence of the contents of the document of which it is a copy.

Service of notices
    
23. —(1) A notice or other document required or authorised to be served for the purposes of this Order may be served by post.

    (2) Where the person on whom a notice or other document to be served for the purposes of this Order is a body corporate, the notice or document is duly served if it is served on the secretary or clerk of that body.

    (3) For the purposes of section 7 of the Interpretation Act 1978[
13] as it applies for the purposes of this article, the proper address of any person in relation to the service on him of a notice or document under paragraph (1) is, if he has given an address for service, that address, and otherwise—

    (4) Where for the purposes of this Order, a notice or other document is required or authorised to be served on a person as having any interest in, or as the occupier of, land and his name or address cannot be ascertained after reasonable enquiry, the notice may be served by—

    (5) This article shall not be taken to exclude the employment of any method of service not expressly provided for by it.

No double recovery
     24. Compensation shall not be payable in respect of the same matter both under this Order and under any other enactment, any contract or any rule of law.

Arbitration
    
25. Unless otherwise agreed between the parties, any difference under any provision of this Order (other than a difference which falls to be determined by the tribunal) shall be referred to and settled by a single arbitrator to be agreed between the parties or, failing agreement, to be appointed on the application of either party (after notice in writing to the other) by the President of the Institution of Civil Engineers.

Defence to proceedings in respect of statutory nuisance
    
26. —(1) Where proceedings are brought under section 82(1) of the Environment Protection Act 1990[14] (summary proceedings by person aggrieved by statutory nuisances) in relation to a nuisance falling within paragraph (g) of section 79(1) of that Act (noise emitted from premises so as to be prejudicial to health or a nuisance) no order shall be made, and no fine may be imposed, under section 82(2) of that Act if the defendant shows—

    (2) The following provisions of the Control of Pollution Act 1974, namely—

shall not apply where the consent relates to the use of premises by the Promoter for the purposes of or in connection with the exercise of the powers conferred by this Order with respect to works.

Planning permission and supplementary matters
     27. —(1) In relation to the application of paragraph 3(c) of the Second Schedule of the Form of Tree Preservation Order set out in the Schedule to the Town and Country Planning (Tree Preservation Order) Regulations 1969[17] (including that paragraph as applied by regulation 3(ii) of the Town and Country Planning (Tree Preservation Order) (Amendment) and (Trees in Conservation Areas) (Exempted Cases) Regulations 1975[18], or as incorporated in any tree preservation order), any direction under section 90(2A) of the 1990 Act deeming planning permission to be granted in relation to works authorised by this Order shall be treated as deeming the permission to have been granted on application made under Part 3 of that Act for the purposes of that Part.

    (2) In relation to the application of article 5(1)(d) of the Form of Tree Preservation Order set out in the Schedule to the Town and Country Planning (Trees) Regulations 1999[19] as incorporated in any tree preservation order or as having effect by virtue of regulation 10(1)(a) of those Regulations, any direction under section 90(2A) of the 1990 Act deeming planning permission to be granted in relation to works authorised by this Order shall not be treated as an outline planning permission.

    (3) Planning permission which is deemed by a direction under section 90(2A) of the 1990 Act to be granted in relation to works authorised by this Order shall be treated as specific planning permission for the purpooses of section 264(3)(a) of that Act (cases in which land is to be treated as operational land for the purposes of that Act).

Savings for regulated rights, etc.
     28. Nothing in this Order shall affect any estate, right or interest granted by Network Rail in respect of a railway facility which is subject to an access contract within the meaning of Part 1 of the Railways Act 1993.



Signed by authority of the Secretary of State


Ellis Harvey
Head of the Transport and Works Act Orders Unit Department for Transport

7th September 2007



SCHEDULES


SCHEDULE 1
Articles 5(1) and 6


SCHEDULED WORKS


In the County of Essex, in Thurrock Borough at Shellhaven, Stanford le Hope—



SCHEDULE 2
Article 20


FOR THE PROTECTION OF NETWORK RAIL


     1. —(1) For the protection of Network Rail the following provisions shall, unless otherwise agreed in writing between the Promoter and Network Rail, have effect—

    (2) In this Schedule—

    (3)

     2. The Promoter shall, before commencing construction of any of the specified works, supply to Network Rail proper and sufficient plans for the reasonable approval of the engineer and shall not commence such construction of the specified works until plans of those works have been approved in writing by the engineer or settled by arbitration.

     3. The approval of the engineer under paragraph 2 shall not be unreasonably withheld or delayed and if by the end of the period of 56 days beginning with the date on which such plans have been supplied to Network Rail the engineer has not intimated his disapproval of those plans and the grounds of his disapproval he shall be deemed to have approved the plans as submitted.

     4. If by the end of the period of 56 days beginning with the date on which such plans have been supplied to Network Rail, Network Rail gives notice to the Promoter that Network Rail desires itself to construct any part of the specified works which in the opinion of the engineer will or may affect the stability of railway property, the safe operation of traffic on the railways of Network Rail or the services of train operators using the same then, if the Promoter desires such part of the specified works to be constructed, Network Rail shall construct it with all reasonable dispatch on behalf of, and to the reasonable satisfaction of, the Promoter in accordance with the plans approved or deemed to be approved or settled as aforesaid.

     5. When signifying his approval or disapproval of the plans the engineer may specify any protective works (whether temporary or permanent) which in his opinion should be carried out before the commencement of construction of the specified works to ensure the safety or stability of railway property, the continuation of safe and efficient operation of the railways of Network Rail or the services of train operators using the same (including any relocation of works, apparatus and equipment necessitated by the specified works) and the comfort and safety of passengers who may be affected by the specified works, and such protective works as may be reasonably necessary for those purposes shall be constructed by Network Rail with all reasonable dispatch, or if Network Rail so desires, such protective works shall be carried out by the Promoter at its own expense and the Promoter shall not commence the construction of the specified works until the engineer has notified the Promoter that the protective works have been completed to his reasonable satisfaction.

     6. The Promoter shall give to the engineer not less than 180 days' notice of its intention to commence the construction of any of the specified works and also, except in emergency (when it shall give such notice as may be reasonably practicable), of its intention to carry out any works for the maintenance or repair of the specified works in so far as such work of repair or maintenance may affect or interfere with railway property.

     7. Any specified work and any protective works to be constructed by virtue of paragraph 5 shall, when commenced, be constructed—

and, if any damage to railway property or any such interference or obstruction shall be caused by the carrying out of the specified works or protective works, the Promoter shall, notwithstanding any such approval, make good such damage and shall pay to Network Rail all reasonable expenses to which Network Rail may be put and compensation for any loss which it may sustain by reason of any such damage, interference or obstruction.

     8. Nothing in paragraph 7 shall impose any liability on the Promoter with respect to any damage, costs, expenses or loss attributable to the negligence of Network Rail or its servants, contractors or agents.

     9. The Promoter shall—

     10. Network Rail shall at all times afford reasonable facilities to the Promoter and its agents for access to any works carried out by Network Rail under this Schedule during their construction and shall supply the Promoter with such information as it may reasonably require with regard to such works or the method of construction of those works.

     11. —(1) If any alterations or additions, either permanent or temporary, to railway property are reasonably necessary during the construction of the specified works, any protective works under paragraph 5 or during a period of 12 months after the completion of the specified works in consequence of the construction of a specified work, such alterations and additions maybe carried out by Network Rail and if Network Rail gives to the Promoter reasonable notice of its intention to carry out such alterations or additions, the Promoter shall pay to Network Rail the reasonable cost thereof including, in respect of any such permanent alterations and additions, a capitalised sum representing any increase in the costs which may be expected to be reasonably incurred by Network Rail in maintaining, working and, when necessary, renewing any such alterations and additions.

    (2) If the cost of maintaining, working or renewing railway property is reduced in consequence of any such alterations or additions referred to in sub-paragraph (1) a capitalised sum representing such saving shall be set off against any sum payable by the Promoter to Network Rail under sub-paragraph (1).

     12. The Promoter shall repay to Network Rail all reasonable fees, costs, charges and expenses reasonably incurred by Network Rail—

     13. If at any time after the completion of a specified work, not being a work vested in Network Rail, Network Rail gives notice to the Promoter informing it that the state of maintenance of the specified work appears to be such as may adversely affect the operation of railway property, the Promoter shall, on receipt of such notice, take steps as may be reasonably necessary to put the specified works in such state of maintenance as not to adversely affect railway property.

     14. The Promoter shall not provide any illumination or illuminated sign or signal on or in connection with a specified work in the vicinity of any railway belonging to Network Rail unless it shall have first consulted Network Rail and it shall comply with Network Rail's reasonable requirements for preventing confusion between such illumination or illuminated sign or signal and any railway signal or other light used for controlling, directing or securing the safety of traffic on the railway.

     15. Any additional expenses which Network Rail may reasonably incur in altering, reconstructing or maintaining railway property under any powers existing at the making of this Order by reason of the existence of a specified work, provided that 56 days' previous notice of the commencement of such alteration, reconstruction or maintenance has been given to the Promoter, shall be repaid by the Promoter to Network Rail.

     16. The Promoter shall pay to Network Rail all reasonable costs, charges, damages and expenses not otherwise provided for in this Schedule which may be occasioned to or reasonably incurred by Network Rail—

and the Promoter shall indemnify Network Rail from and against all claims and demands arising out of or in connection with the specified works or any such failure, act or omission, and the fact that any act or thing may have been done by Network Rail on behalf of the Promoter or in accordance with plans approved by the engineer or in accordance with any requirement of the engineer or under his supervision shall not (if it was done without negligence on the part of Network Rail or of any person in its employment or of its contractors or agents) excuse the Promoter from any liability under the provisions of this Schedule.

     17. Network Rail shall give to the Promoter reasonable notice of any claim or demand under paragraph 16 and no settlement or compromise of such a claim or demand shall be made without the prior consent of the Promoter.

     18. —(1) In this paragraph—

    (2) This paragraph shall apply to EMI only to the extent that such EMI is not attributable to any change to Network Rail's apparatus carried out after approval of plans under paragraph 2 for the relevant part of the authorised works giving rise to EMI (unless the Promoter has been given notice in writing before the approval of those plans of the intention to make such change) other than any change carried out by Network Rail as part of, or in consequence of, the authorised works.

    (3) Subject to sub-paragraph (5), the Promoter shall in the design and construction of the authorised works take all measures necessary to prevent EMI and shall establish with Network Rail (both parties acting reasonably) appropriate arrangements to verify their effectiveness.

    (4) In order to facilitate the Promoter's compliance with sub-paragraph (3)—

    (5) In any case where it is established that EMI can only reasonably be prevented by modifications to Network Rail's apparatus, Network Rail shall not withhold its consent unreasonably to modifications of Network Rail's apparatus, but the means of prevention and the method of their execution shall be selected in Network Rail's reasonable discretion and in relation to such modifications paragraph 2 shall have effect subject to this sub-paragraph.

    (6) If at any time prior to the opening of authorised works for the passage of railway traffic and notwithstanding any measures adopted pursuant to sub-paragraph (3) above, the testing or commissioning of authorised works causes EMI, then the Promoter shall immediately upon receipt of notification by Network Rail of such EMI either in writing or communicated orally (such oral communication to be confirmed in writing as soon as reasonably practicable after it has been issued), forthwith cease to use (or procure the cessation of use of) the Promoter's apparatus causing such EMI until all measures necessary have been taken to remedy such EMI by way of modification to the source of such EMI or (in the circumstances, and subject to the consent specified in sub-paragraph (5)) to Network Rail's apparatus.

    (7) In the event of EMI having occurred—

    (8) Where Network Rail approves modifications to apparatus pursuant to sub-paragraphs (5) or (6)—

    (9) To the extent that it would not otherwise do so, the indemnity in paragraph 16 shall apply to the costs and expenses reasonably incurred or losses suffered by Network Rail through the implementation of the provisions of this paragraph (including costs incurred in connection with the consideration of proposals, approval of plans, supervision and inspection of works and facilitating access to Network Rail's apparatus) or in consequence of any EMI to which sub-paragraph (6) applies.

    (10) For the purpose of sub-paragraph 12(a) any modifications to Network Rail's apparatus under this paragraph shall be deemed to be protective works referred to in that paragraph.

    (11) In relation to any dispute arising under this paragraph the reference in article 25 (arbitration) to the Institution of Civil Engineers shall be read as a reference to the Institution of Engineering and Technology.

     19. —(1) The sums payable by the Promoter under paragraph 16 shall include a sum equivalent to the relevant costs.

    (2) Subject to the terms of any agreement between Network Rail and the relevant train operators regarding the timing or method of payment of the relevant costs in respect of that train operator, Network Rail shall promptly pay to each train operator the amount of any sums which Network Rail receives under sub-paragraph (1) which relates to the relevant costs of that train operator.

    (3) The obligation under sub-paragraph (1) to pay to Network Rail the relevant costs shall, in the event of default, be enforceable directly by any train operator concerned to the extent that such sums would be payable to that operator pursuant to sub-paragraph (1).

     20. Subject to paragraph 18(11) any difference arising between the Promoter and Network Rail under this Schedule shall be referred to and settled by arbitration under article 25 (arbitration).



SCHEDULE 3
Article 21


FOR THE PROTECTION OF THE ENVIRONMENT AGENCY


     1. For the protection of the Agency the following provisions shall, unless otherwise agreed in writing between the Promoter and the Agency, have effect.

Definitions applying to this Schedule
     2. In this Schedule—

Pre-conditions to commencing any specified work affecting a drainage work
     3. —(1) Before beginning to construct any specified work, the Promoter shall submit to the Agency plans of the work and such further particulars available to it as the Agency may within 28 days of the submission of the plans reasonably require.

    (2) Any such specified work shall not be constructed except in accordance with such plans as may be approved in writing by the Agency, or determined under paragraph 14.

    (3) Any approval of the Agency required under this paragraph—

     4. Without prejudice to the generality of paragraph 3, the conditions or requirements which the Agency may make under that paragraph include—

     5. —(1) Subject to sub-paragraph (2), any specified work, and all compensatory habitat and protective works required by the Agency under paragraph 4, shall be constructed—

and the Agency shall be entitled by its officer to water and inspect the construction of such works.

    (2) The Promoter shall give to the Agency not less than 14 days' notice in writing of its intention to commence construction of any specified work and notice in writing of its completion not later than 7 days after the date on which it is brought into use.

    (3) If any part of the specified works comprising a structure in, over or under a watercourse is constructed otherwise than in accordance with the requirements of this Schedule, the Agency may by notice in writing require the Promoter, at the Promoter's own expense, to comply with the requirements of this Schedule or (if the Promoter so elects and the Agency in writing consents, such consent not to be unreasonably withheld or delayed) to remove, alter or pull down the work and, where removal is required, to restore the site to its former condition to such extent as the Agency reasonably requires.

    (4) Subject to sub-paragraph (5), if within a reasonable period, being not less than 28 days from the date when a notice under sub-paragraph (3) is served upon the Promoter, it has failed to begin taking steps to comply with the requirements of the notice and thereafter complete them within such reasonable period as may be specified in such notice, the Agency may execute the works specified in the notice and any expenditure reasonably incurred by it in so doing shall be recoverable from the Promoter.

    (5) In the event of any dispute as to whether sub-paragraph (4) is properly applicable to any work in respect of which notice has been served under that sub-paragraph, or as to the reasonableness of any requirement of such a notice, the Agency shall not except in a case of emergency exercise the powers conferred by sub-paragraph (4) until the dispute has been finally determined.

Survey of any drainage work liable to be affected by a specified work
     6. Before commencing the construction of a specified work the Promoter shall procure at its expense, in liaison with and to the reasonable satisfaction of the Agency, a survey of any drainage work liable to be affected by that specified work.

Maintenance by the Promoter of any drainage work liable to be affected by a specified work
     7. —(1) Subject to sub-paragraph (2), the Promoter shall, from the commencement of the construction of the specified works and except to the extent that any approval given by the Agency under this Schedule permits otherwise, maintain in good repair and condition and free from obstruction any drainage work which is situated within the limits of deviation and on land owned by the Promoter or which it otherwise has control of, or is in occupation of, for the purposes of or in connection with the specified works, whether or not the drainage work is constructed under the powers of this Order or is already in existence.

    (2) The obligation imposed on the Promoter under sub-paragraph (1) does not apply where the Agency or another person is liable to maintain any such work and is not precluded by the exercise of the powers of this Order from doing so.

    (3) If any drainage work referred to in sub-paragraph (1) is not maintained in good repair and condition and free from obstruction the Agency may by notice in writing require the Promoter to repair and restore the work, or any part thereof, of (if the Promoter so elects and the Agency in writing consents, such consent not to be unreasonably withheld or delayed), to remove the work and restore the site (including sea defences) to its former condition, to such extent and within such limits as the Agency reasonably requires.

    (4) If, within a reasonable period being not less than 28 days beginning with the date on which a notice in respect of any drainage work is served under sub-paragraph (3) on the Promoter, the Promoter has failed to begin taking steps to comply with the reasonable requirements of the notice and thereafter completed them within such reasonable period as may be specified in the notice, the Agency may do what is necessary for such compliance and may recover any expenditure reasonably incurred by it in so doing from the Promoter.

    (5) In the event of any dispute as to the reasonableness of any requirement of a notice served under sub-paragraph (3), the Agency shall not except in a case of emergency exercise the powers of sub-paragraph (4) until the dispute has been finally determined.

Impairment of efficiency of drainage work for flood defence
     8. If by reason of the construction of any specified work, or of the failure of any such work, or of the Promoter to maintain it, the efficiency of any drainage work for flood defence purposes is impaired, or that work is otherwise damaged, such impairment or damage shall be made good by the Promoter to the reasonable satisfaction of the Agency and if the Promoter fails to do so within such reasonable period as the Agency may require by notice in writing to the Promoter, the Agency may make good the same and recover from the Promoter the expense reasonably incurred by it in so doing.

Protection of fishery
     9. —(1) The Promoter shall take all such measures as may be reasonably practicable to prevent any interruption of the free passage of fish in the fishery during the construction of any specified work.

    (2) If by reason of—

damage to the fishery is caused, or the Agency has reason to expect that such damage may be caused, the Agency may serve notice on the Promoter requiring it to take such steps as may be reasonably practicable to make good the damage, or, as the case may be, to protect the fishery against such damage.

    (3) If, within such time as may be reasonably practicable for that purpose after the receipt of written notice from the Agency of any damage or expected damage to a fishery, the Promoter fails to take such steps as are described in sub-paragraph (2), the Agency may take those steps and may recover from the Promoter the expense reasonably incurred by it in so doing.

    (4) In any case where immediate action by the Agency is reasonably required in order to secure that the risk of damage to the fishery is avoided or reduced, the Agency may take such steps as are reasonable for the purpose, and may recover from the Promoter the reasonable cost of so doing provided that notice specifying those steps is served on the Promoter as soon as reasonably practicable after the Agency has taken, or commenced to take, the steps specified in the notice.

Indemnity as to costs and expenses
     10. The Promoter shall indemnify the Agency in respect of all reasonable and proper costs, charges and expenses which the Agency may reasonably incur or have to pay or which it may sustain—

     11. —(1) Without prejudice to the other provisions of this Schedule, the Promoter shall indemnify the Agency from all claims, demands, proceedings, costs, damages or expenses or loss, which may be made or taken against, or recovered from or incurred by the Agency by reason of—

which is caused by the construction of any of the specified works or any act or omission of the Promoter, its contractors, agents or employees whilst engaged upon the specified works.

    (2) The Agency shall give to the Promoter reasonable notice of any such claim or demand and no settlement or compromise of any such claim or demand shall be made without the consent of the Promoter, which shall not be unreasonably withheld.

No relief of liability
     12. The fact that any work or thing has been executed or done by the Promoter in accordance with a plan approved or deemed to be approved by the Agency, or to its satisfaction, or in accordance with any directions or award of an arbitrator, shall not relieve the Promoter from any liability under the provisons of this Schedule.

Approvals deemed and not deemed
     13. —(1) For the purposes of section 109 of the Water Resources Act 1991[
22] (as to structures in, over or under watercourses) as applying to the construction of any specified work, any approval given or deemed to be given by the Agency under this Schedule with respect to such construction shall be deemed also to constitute a consent under that section.

    (2) Except as otherwise provided by this Schedule, nothing in this Order shall prejudice or affect in their application to the Agency the powers, rights, jurisdictions and obligations conferred, arising or imposed under the Land Drainage Act 1991[23], the Salmon and Freshwater Fisheries Act 1975[24], the Water Resources Act 1991 or any enactment, byelaw or regulation relating to the Agency.

Arbitration
     14. Any dispute arising between the promoter and the Agency under this Schedule shall, if the parties agree, be determined by arbitration in the London Court of International Arbitration and in accordance with its rules, but shall otherwise be referred to the Secretary of State for Transport and the Secretary of State for the Environment, Food and Rural Affairs, acting jointly.



EXPLANATORY NOTE

(This note is not part of the Order)


This Order authorises the Promoter to construct and operate various railways and other works on land within or adjacent to the Shell redundant oil refinery site, Shellhaven, Stanford-le-Hope, in the Borough of Thurrock in Essex.

A copy of the deposited plans and the deposited sections referred to in this Order may be inspected at the London Gateway site offices, Shell Haven, The Manorway, Stanford-le-Hope, Essex SS17 9PD.


Notes:

[1] S.I. 2000/2190.back

[2] 1992 c. 42.back

[3] 1990 c. 8.back

[4] 1991 c. 22. As amended by the Traffic Management Act 2004 c. 18.back

[5] 1980 c. 66.back

[6] 1845 c. 10.back

[7] Amended by Criminal Law Act 1977 (1977 c. 45) s. 31(6) and Criminal Justice Act 1982 (1982 c. 48) ss. 37 and 46.back

[8] Amended by the Transport and Works Act 1992 (1992 c. 42) s. 49.back

[9] 1923 c. 20.back

[10] 1991 c. 57.back

[11] 1961 c. 33.back

[12] 1993 c. 43.back

[13] 1978 c. 30.back

[14] 1990 c. 43. Section 82(1) was inserted by Environment Act 1995 (1995 c. 25) s. 107.back

[15] 1974 c. 40.back

[16] 1990 c. 43 as amended by Environment Act 1995 (1995 c. 25) s. 107, Sch 17 and Noise and Statutory Nuisance Act 1993 (1993 c. 40) s. 5.back

[17] S.I 1969. 17.back

[18] S.I. 1975/148.back

[19] S.I. 1999/1892.back

[20] 1985 c. 6.back

[21] 1993 c. 43.back

[22] 1991 c. 57.back

[23] 1991 c. 59.back

[24] 1975 c. 51.back



ISBN 978 0 11 078768 8


 © Crown copyright 2007

Prepared 17 September 2007