The Offshore Installations (Safety Zones) Order 2013 No. 1758


BAILII is celebrating 24 years of free online access to the law! Would you consider making a contribution?

No donation is too small. If every visitor before 31 December gives just £1, it will have a significant impact on BAILII's ability to continue providing free access to the law.
Thank you very much for your support!



BAILII [Home] [Databases] [World Law] [Multidatabase Search] [Help] [Feedback]

United Kingdom Statutory Instruments


You are here: BAILII >> Databases >> United Kingdom Statutory Instruments >> The Offshore Installations (Safety Zones) Order 2013 No. 1758
URL: http://www.bailii.org/uk/legis/num_reg/2013/uksi_20131758_en_1.html

[New search] [Printable PDF version] [Help]


Statutory Instruments

2013 No. 1758

Offshore Installations

The Offshore Installations (Safety Zones) Order 2013

Made

15th July 2013

Coming into force in accordance with article 1(2)

The Secretary of State makes this Order-

(a)

in exercise of the powers conferred by section 22 of the Petroleum Act 1987(1); and

(b)

for the purpose of giving effect to proposals submitted to him by the Health and Safety Executive under section 24(2A)(2) of that Act.

Citation and commencement

1.-(1) This Order may be cited as the Offshore Installations (Safety Zones) Order 2013.

(2) This Order comes into force on 6th August 2013 except for article 2(2) which comes into force as provided in article 2(3).

Establishment of safety zones

2.-(1) A safety zone is established around each installation specified in column 1 of Part 1 of the Schedule (being an installation stationed in waters to which subsection (7) of section 21 of the Petroleum Act 1987 applies) having a radius of five hundred metres, as respects that installation, from the point which has the co-ordinates of latitude and longitude according to the World Geodetic System 1984(3) specified in columns 2 and 3 of Part 1 of the Schedule.

(2) A safety zone is established around each installation specified in column 1 of Part 2 of the Schedule (being an installation to be stationed in waters to which subsection (7) of section 21 of the Petroleum Act 1987 applies) having a radius of five hundred metres, as respects that installation, from the point which has the co-ordinates of latitude and longitude according to the World Geodetic System 1984 specified in columns 2 and 3 of Part 2 of the Schedule.

(3) Paragraph (2) comes into force, as respects each installation specified in column 1 of Part 2 of the Schedule, when the installation arrives at its station.

Amendment of the Offshore Installations (Safety Zones) (No. 3) Order 2004

3.  In the Offshore Installations (Safety Zones) (No. 3) Order 2004(4), in the Schedule, omit the entry for Arthur Production Well 1 and Subsea Manifold including its co-ordinates.

Signed by authority of the Secretary of State for Work and Pensions

Mark Hoban

Minister of State

Department for Work and Pensions

15th July 2013

Article 2

SCHEDULEINSTALLATIONS

PART 1Installations stationed at time the Order is made

(1)

Name or other designation of the offshore installation

(2)

Latitude

(3)

Longitude

Arthur Production Well 1 and Subsea Manifold

Block 53/02, Thames and Welland Field

Carrack East Drill Site

Block 49/15a, Carrack Field

Carrack West Drill Site

Block 49/14b, Carrack Field

52°54.726' North

53°34.53' North

53°35.84' North

02°14.847' East

02°52.86' East

02°41.85' East

Curlew CUC-P1 Drill Site

Block 29/07, Curlew C1 Field

Production Well P1

Block 211/23d, Causeway Field

Production Well P2

Block 211/22a, Fionn Field

Schiehallion

Block 204/20, Schiehallion/Loyal Field

Water Injection Well WI

Block 211/23d, Causeway Field

56°44.13' North

61°16.49' North

61°14.44' North

60°21.38' North

61°15.75' North

01°23.27' East

01°25.83' East

01°22.06' East

04°04.07' West

01°25.54' East

PART 2Installations not stationed at time the Order is made

(1)

Name or other designation of the offshore installation

(2)

Latitude

(3)

Longitude

Galia Production Drill Centre

Block 30/24b, Galia Field

Juliet Subsea Manifold

Block 47/14b, Juliet Field

Kew Wellhead

Block 49/04c, Chiswick Field

Solan Production Well P1

Block 205/26a, Solan Field

Solan Production Well P2

Block 205/26a, Solan Field

56°11.147' North

53°33.19' North

53°57.30' North

60°03.84' North

60°03.76' North

02°41.325' East

00°45.25' East

02°47.07' East

03°58.53' West

03°58.68' West

EXPLANATORY NOTE

(This note is not part of the Order)

This Order establishes, under section 22 of the Petroleum Act 1987, safety zones having a radius of 500 metres from the specified point around the thirteen installations (which are subsea installations) specified in the Schedule to this Order stationed, or to be stationed, in waters to which section 21(7) of that Act applies (these include territorial waters and waters in areas designated under section 1(7) of the Continental Shelf Act 1964 (c.29)).

Vessels, which for this purpose include hovercraft, submersible apparatus and installations in transit, are prohibited from entering or remaining in a safety zone except with the consent of the Health and Safety Executive or in accordance with regulations made under section 23(1) of the Petroleum Act 1987 (currently the Offshore Installations (Safety Zones) Regulations 1987 (S.I. 1987/1331)).

The United Kingdom Hydrographic Office (UKHO) (http://www.ukho.gov.uk/Pages/Home.aspx) publish nautical charts covering the area in which installations are located, which include information on the existence and, where the scale allows, the location of safety zones. Mariners are advised to keep paper charts up-to-date using appropriate Notices to Mariners or, where electronic charts are used, to subscribe to an appropriate updating service. Vessels meeting the requirements of the International Convention for the Safety of Life at Sea 1974 will carry nautical charts and nautical publications (such as Notices to Mariners) to plan and display the ship's route for the intended voyage and to plot and monitor positions throughout the voyage. This may be compulsory for some vessels, for example under the Merchant Shipping (Safety of Navigation) Regulations 2002 (S.I. 2002/1473). The UKHO also broadcasts Radio Navigational Warnings in relation to safety zones where updates to charts have yet to take effect and where installations are in transit.

Maritime safety information, which includes information on safety zones, is issued via the appropriate International Maritime Organisation, Global Maritime Distress and Safety System broadcast systems as defined by the World-Wide Navigational Warning Service.

It is estimated that the following installations, which are not on station at the time of making this Order, will arrive at their stations at the approximate time set opposite their name in the table below:

Name of installation

Estimated arrival at station

Galia Production Drill CentreOctober 2013

Juliet Subsea Manifold

Kew Wellhead

Solan Production Well P1

Solan Production Well P2

23 August 2013

September 2013

30 September 2013

30 September 2013

(2)

Section 24(2A) was inserted by S.I. 1993/1823 and amended by S.I. 2008/960.

(3)

The World Geodetic System 1984 ("WGS 84") defines a reference frame for the earth, for use in geodesy and navigation. It was developed by the United States' National Geospatial-Intelligence Agency and is maintained by it. WGS 84 is defined at paragraph 2.1 of the United States' National Imagery and Mapping Agency Technical Report TR8350.2, third edition, amendment 1 of 3rd January 2000 entitled "Department of Defense World Geodetic System 1984" (http://earth-info.nga.mil/GandG/publications/tr8350.2/wgs84fin.pdf).


BAILII: Copyright Policy | Disclaimers | Privacy Policy | Feedback | Donate to BAILII
URL: http://www.bailii.org/uk/legis/num_reg/2013/uksi_20131758_en_1.html