BAILII is celebrating 24 years of free online access to the law! Would you consider making a contribution?
No donation is too small. If every visitor before 31 December gives just £1, it will have a significant impact on BAILII's ability to continue providing free access to the law.
Thank you very much for your support!
[Home] [Databases] [World Law] [Multidatabase Search] [Help] [Feedback] | ||
United Kingdom Statutory Instruments |
||
You are here: BAILII >> Databases >> United Kingdom Statutory Instruments >> The Railtrack (Shortlands Junction) Order 2001 URL: http://www.bailii.org/uk/legis/num_reg/2001/20012870.html |
[New search] [Help]
Made | 27th June 2001 | ||
Coming into force | 18th July 2001 |
1. | Citation and commencement |
2. | Interpretation |
3. | Incorporation of the Railways Clauses Consolidation Act 1845 |
4. | Power to construct and maintain scheduled works |
5. | Power to construct and maintain ancillary works |
6. | Power to deviate |
7. | Discharge of water |
8. | Safeguarding works to buildings |
9. | Power to survey and investigate land |
10. | Temporary stopping up of streets |
11. | Temporary widening of carriageways |
12. | Traffic restrictions |
13. | Power to acquire land |
14. | Application of Part I of the Compulsory Purchase Act 1965 |
15. | Power to acquire new rights |
16. | Temporary use of land for construction of works |
17. | Disregard of certain interests and improvements |
18. | Acquisition of part only of certain properties |
19. | Extinction or suspension of private rights of way |
20. | Time limit for exercise of powers of acquisition |
21. | Control of construction sites: appeals |
22. | Defence to proceedings in respect of statutory nuisance |
23. | Planning permission: supplementary matters |
24. | Saving for regulated rights etc. |
25. | Statutory undertakers, etc. |
26. | Protective provisions |
27. | Certification of plans etc. |
28. | Maintenance of approved works etc. |
29. | Service of notices |
30. | No double recovery |
31. | Arbitration |
Schedule 1 - | The scheduled works |
Schedule 2 - | Modification of compensation and compulsory purchase enactments for creation of new rights |
Schedule 3 - | Land of which temporary possession may be taken |
Schedule 4 - | Statutory undertakers, etc |
Schedule 5 - | Protective provisions |
Part I - | Protection for electricity, gas and water undertakers |
Part II - | Protection for telecommunications operators |
Part III - | Protection for sewerage undertakers |
(2) References in this Order to rights over land include references to rights to do, or to place and maintain, anything in or on land or in the air space over its surface.
(3) All directions, distances and lengths stated in any description of works, powers or lands shall be construed as if the words "or thereabouts" were inserted after each such direction, distance and length.
(4) Any reference in this Order to a work identified by the number of the work shall be construed as a reference to the work of that number authorised by this Order.
Incorporation of the Railways Clauses Consolidation Act 1845
3.
- (1) The following provisions of the Railways Clauses Consolidation Act 1845[8] shall be incorporated in this Order -
(2) In those provisions, as incorporated in this Order -
(3) Section 24 of the said Act of 1845, as incorporated in this Order, shall have effect as if the maximum fine which may be imposed on summary conviction of an offence under that section were instead of a fine not exceeding level 2 on the standard scale, a fine not exceeding level 3 on the standard scale.
(2) Railtrack may within the Order limits -
Power to deviate
6.
- (1) In constructing or maintaining any scheduled work, Railtrack may -
(2) The centre line of any track comprised in Work No. 3 shall not be located any closer to the houses on the southern side of the existing railway than the centre line for that work shown on the deposited plans.
Discharge of water
7.
- (1) Railtrack may use any watercourse or any public sewer or drain for the drainage of water in connection with the construction or maintenance of the authorised works and for that purpose may lay down, take up and alter pipes and may, on any land within the Order limits, make openings into, and connections with, the watercourse, sewer or drain.
(2) Railtrack shall not discharge any water into any watercourse, public sewer or drain except with the consent of the authority to which it belongs; and such consent may be given subject to such terms and conditions as the authority may reasonably impose but shall not be unreasonably withheld.
(3) Railtrack shall not make any opening into any public sewer or drain except in accordance with plans approved by, and under the superintendence (if provided) of, the authority to which the sewer or drain belongs, but such approval shall not be unreasonably withheld.
(4) Railtrack shall not, in the exercise of the powers conferred by this article, damage or interfere with the bed or banks of any watercourse forming part of a main river.
(5) Railtrack shall take such steps as are reasonably practicable to secure that any water discharged into a watercourse or public sewer or drain under the powers conferred by this article is as free as may be practicable from gravel, soil or other solid substance or oil or matter in suspension.
(6) This article does not authorise the entry into controlled waters of any matter whose entry or discharge into controlled waters is prohibited by section 85(1), (2) or (3) of the Water Resources Act 1991[10].
(7) In this article -
Safeguarding works to buildings
8.
- (1) Subject to the following provisions of this article, Railtrack may at its own expense and from time to time carry out such safeguarding works to any building within the Order limits as Railtrack considers to be necessary or expedient.
(2) Safeguarding works may be carried out -
(3) For the purpose of determining how the functions under this article are to be exercised Railtrack may enter and survey any building falling within paragraph (1) above and any land belonging to it.
(4) For the purpose of carrying out safeguarding works under this article to a building Railtrack may (subject to paragraphs (5) and (6) below) -
(5) Before exercising -
Railtrack shall, except in the case of emergency, serve on the owners and occupiers of the building or land not less than 14 days' notice of its intention to exercise that right and, in a case within sub-paragraph (a) or (c) above, specifying the safeguarding works proposed to be carried out.
(6) Where notice is served under paragraph (5)(a), (c) or (d) above, the owner or occupier of the building or land concerned may, by serving a counter-notice within the period of 10 days beginning with the day on which the notice was served, require the question whether it is necessary or expedient to carry out the safeguarding works or to enter the building or land to be referred to arbitration under article 31 below.
(7) Railtrack shall compensate the owners and occupiers of any building or land in relation to which the powers of this article have been exercised for any loss or damage arising to them by reason of the exercise of those powers.
(8) Where -
Railtrack shall compensate the owners and occupiers of the building for any damage sustained by them.
(9) Nothing in this article shall relieve Railtrack from any liability to pay compensation under section 10(2) of the 1965 Act.
(10) Any compensation payable under paragraph (7) or (8) above shall be determined, in case of dispute, under Part I of the 1961 Act.
(11) In this article -
Power to survey and investigate land
9.
- (1) Railtrack may for the purposes of this Order -
(2) No land may be entered, or equipment placed or left on or removed from the land under paragraph (1) above, unless at least 7 days' notice has been served on every owner and occupier of the land.
(3) Any person entering land under this article on behalf of Railtrack -
(4) No trial holes shall be made under this article in a carriageway or footway without the consent of the street authority, but such consent shall not be unreasonably withheld.
(5) Railtrack shall make compensation for any damage occasioned, by the exercise of the powers conferred by this article, to the owners and occupiers of the land, such compensation to be determined, in case of dispute, under Part I of the 1961 Act.
(6) Nothing in this article shall obviate any need to obtain scheduled monument consent under the Ancient Monuments and Archaeological Areas Act 1979[11].
Temporary stopping up of streets
10.
- (1) Railtrack, during and for the purposes of the execution of the authorised works, may temporarily stop up, alter or divert so much of Downs Hill ("the street") as falls within the limits of deviation for Work No. 5A and may for any reasonable time -
(2) Railtrack may use the street stopped up under the powers of this article as a temporary working site.
(3) Railtrack shall provide reasonable access for pedestrians going to or from premises abutting on the street affected by the exercise of the powers conferred by this article, if there would otherwise be no such access.
(4) Railtrack shall not exercise the powers of this article without first consulting the street authority.
(5) The provisions of the Street Works Act mentioned in paragraph (6) below and any regulations made, or code of practice issued or approved under, those provisions shall apply (with the necessary modifications) in relation to the stopping up, alteration or diversion of the street by Railtrack under the powers conferred by this article where no street works are executed in the street as they would apply if the stopping up, alteration or diversion were occasioned by street works executed in the street by Railtrack.
(6) The provisions of the Street Works Act referred to in paragraph (5) above are -
all such other provisions as apply for the purposes of the provisions mentioned above.
(7) Any person who suffers loss by the suspension of a private right of way under this article shall be entitled to compensation to be determined, in case of dispute, under Part I of the 1961 Act.
Temporary widening of carriageways
11.
- (1) Railtrack may, for the purpose of providing an improved access to the working site, temporarily increase the width of the carriageways of the relevant streets by incorporating within those carriageways so much of the footways of the relevant streets and of Bromley Road as lies within the limits marked "Limit of temporary widening of access" on the deposited plans.
(2) On giving up possession of the working site Railtrack shall restore the footways referred to in paragraph (1) above to the reasonable satisfaction of the street authority.
(3) For the duration of a period commencing with the completion of the widening of the carriageways of the relevant streets in accordance with paragraph (1) above and terminating on the restoration of the footways of those streets in accordance with paragraph (2) above, the relevant streets, as so widened, shall be maintained by and at the expense of Railtrack.
(4) In this article -
Traffic restrictions
12.
- (1) Subject to the provisions of this article Railtrack may during and for the purposes of the authorised works from the commencement of this Order and with the consent of the traffic authority in whose area the relevant street is situated (such consent not to be unreasonably withheld) -
(2) Railtrack shall not exercise the powers of this article unless it has -
(3) Any prohibition or restriction made by Railtrack under paragraph (1) above shall have effect as if duly made by the traffic authority in whose area the relevant street is situated as a traffic regulation order under the 1984 Act.
(4) Any prohibition or restriction made by Railtrack under paragraph (1) above shall not apply to any vehicle of a statutory utility for so long as it is engaged in connection with the laying, erection, alteration, repair or inspection of any apparatus of that utility.
(5) In this article -
(2) Part I of the 1965 Act, as so applied, shall have effect as if section 4 (which provides a time limit for compulsory purchase of land) and paragraph 3(3) of Schedule 3 (which makes provisions as to the giving of bonds) were omitted.
Power to acquire new rights
15.
- (1) Railtrack may compulsorily acquire such easements or other rights over any land referred to in article 13 above as may be required for any purpose for which that land may be acquired under that provision, by creating them as well as by acquiring easements or other rights already in existence.
(2) Railtrack may compulsorily acquire a permanent right of access for the purpose of maintaining the authorised works along such route (limited to 5 metres in width) as it may reasonably require over the land shown numbered 18b on the deposited plans.
(3) Railtrack may compulsorily acquire such soil nailing rights in the subsoil of the land shown numbered 2 on the deposited plans as it considers necessary or expedient in connection with the construction of the authorised works.
(4) Subject to section 8 of the 1965 Act (as substituted by paragraph 5 of Schedule 2 to this Order), where Railtrack acquires a right over land under this article it shall not be required to acquire a greater interest in it.
(5) Paragraph (1) above shall be treated as also authorising acquisition of easements or other rights by a statutory utility in any case where the Secretary of State gives his consent in writing.
(6) Paragraph (5) above applies to land within the limits of deviation which is or will be required for use in relocating any apparatus which it is expedient to divert or replace in consequence of the carrying out of the works authorised by this Order; and in that paragraph "statutory utility" means a licence holder within the meaning of Part I of the Electricity Act 1989[13], a public gas transporter within the meaning of Part I of the Gas Act 1986[14], a water undertaker within the meaning of the Water Industry Act 1991[15], a sewerage undertaker within Part I of that Act and any local authority which is a relevant authority for the purposes of section 97 of that Act.
(7) Schedule 2 to this Order shall have effect for the purpose of modifying the enactments relating to compensation and the provisions of the 1965 Act in their application in relation to the compulsory acquisition under this article of a right over land by the creation of a new right.
(8) In this article "soil nailing rights" means rights to insert soil nails into the subsoil or to carry out other subsoil works for the purposes of strengthening and stabilising the railway cutting.
(9) References in this article to the subsoil of land are references to the subsoil lying more than one metre beneath the level of the surface of the land; and for this purpose "the level of the surface of the land" means -
Temporary use of land for construction of works
16.
- (1) Railtrack may, in connection with the carrying out of the authorised works -
(2) Not less than 14 days before entering upon and taking temporary possession of land under this article Railtrack shall serve notice of the intended entry on the owners and occupiers of the land.
(3) Railtrack may not, without the agreement of the owners of the land, remain in possession of any land under this article after the end of the period of one year beginning with the date of completion of the work specified in relation to that land in column (4) of Schedule 3 to this Order.
(4) Before giving up possession of land of which temporary possession has been taken under this article, Railtrack shall remove all temporary works and restore the land to the reasonable satisfaction of the owners of the land; but Railtrack shall not be required to replace a building removed under this article.
(5) Railtrack shall pay compensation to the owners and occupiers of land of which temporary possession is taken under this article for any loss or damage arising from the exercise in relation to the land of the powers conferred by this article.
(6) Any dispute as to a person's entitlement to compensation under paragraph (5) above, or as to the amount of the compensation, shall be determined under Part I of the 1961 Act.
(7) Without prejudice to article 30 below, nothing in this article shall affect any liability to pay compensation under section 10(2) of the 1965 Act or under any other enactment in respect of loss or damage arising from the execution of any works, other than loss or damage for which compensation is payable under paragraph (5) above.
(8) The powers of compulsory acquisition of land conferred by this Order shall not apply in relation to the land referred to in paragraph (1) above except that Railtrack shall not be precluded from acquiring new rights under paragraph (2) of article 15 above over the land referred to in that paragraph.
(9) Where Railtrack takes possession of land under this article, it shall not be required to acquire the land or any interest in it.
(10) In this article "building" includes structure or any other erection.
if the tribunal is satisfied that the creation of the interest, the erection of the building, the execution of the works or the making of the improvement or alteration was not reasonably necessary and was undertaken with a view to obtaining compensation or increased compensation.
(2) In paragraph (1) above "relevant land" means the land acquired from the person concerned or any other land with which he is, or was at the time when the building was erected, the works executed or the improvement or alteration made, directly or indirectly concerned.
(2) In such a case, the owner may, within the period of 21 days beginning with the day on which the notice was served, serve on Railtrack a counter-notice objecting to the sale of the land subject to the notice to treat and stating that he is willing and able to sell the whole ("the land subject to the counter-notice").
(3) If no such counter-notice is served within that period, the owner shall be required to sell the land subject to the notice to treat.
(4) If such a counter-notice is served within that period, the question whether the owner shall be required to sell only the land subject to the notice to treat shall, unless Railtrack agrees to take the land subject to the counter-notice, be referred to the tribunal.
(5) If on such a reference the tribunal determine that the land subject to the notice to treat can be taken -
the owner shall be required to sell the land subject to the notice to treat.
(6) If on such a reference the tribunal determine that only part of the land subject to the notice to treat can be taken -
the notice to treat shall be deemed to be a notice to treat for that part.
(7) If on such a reference the tribunal determine that -
the notice to treat shall be deemed to be a notice to treat for the land to which the material detriment is confined in addition to the land already subject to the notice, whether or not the additional land is land which Railtrack is authorised to acquire compulsorily under this Order.
(8) If Railtrack agrees to take the land subject to the counter-notice, or if the tribunal determine that -
the notice to treat shall be deemed to be a notice to treat for the land subject to the counter-notice whether or not the whole of that land is land which Railtrack is authorised to acquire compulsorily under this Order.
(9) In any case where by virtue of a determination by the tribunal under this article a notice to treat is deemed to be a notice to treat for less land or more land than that specified in the notice, Railtrack may, within the period of 6 weeks beginning with the day on which the determination is made, withdraw the notice to treat; and if it does so shall pay to the owner compensation for any loss or expense occasioned to him by the giving and withdrawal of the notice, to be determined in case of dispute by the tribunal.
(10) Where the owner is required under this article to sell only part of a house, building or factory or of land consisting of a house with a park or garden, Railtrack shall pay him compensation for any loss sustained by him due to the severance of that part in addition to the value of the interest acquired.
Extinction or suspension of private rights of way
19.
- (1) All private rights of way over land subject to compulsory acquisition under this Order shall be extinguished -
whichever is sooner.
(2) All private rights of way over land of which Railtrack takes temporary possession under article 16 above shall be suspended and unenforceable for as long as Railtrack remains in lawful possession of the land.
(3) Any person who suffers loss by the extinguishment or suspension of any private right of way under this article shall be entitled to compensation to be determined, in case of dispute, under Part I of the 1961 Act.
(4) This article does not apply in relation to any right of way to which section 271 or 272 of the Town and Country Planning Act 1990[16] (extinguishment of rights of statutory undertakers etc.) applies.
Time limit for exercise of power of acquisition
20.
- (1) The powers conferred by this Order to acquire land or rights over land compulsorily, and the power conferred by article 16 above to enter upon and take temporary possession of land, shall cease at the end of the period of one year beginning on the day on which this Order comes into force.
(2) Paragraph (1) above shall not prevent Railtrack remaining in possession of land in accordance with article 16 above after the end of that period, if the land was entered and possession of it was taken before the end of that period.
(2) The following provisions of the Control of Pollution Act 1974, namely -
shall not apply where the consent relates to the use of premises by Railtrack for the purposes of or in connection with the exercise of the powers conferred by this Order with respect to works.
(4) Where for the purposes of this Order a notice or other document is required or authorised to be served on a person as having any interest in, or as the occupier of, land and his name or address cannot be ascertained after reasonable enquiry, the notice may be served by -
(5) This article shall not be taken to exclude the employment of any method of service not expressly provided for by it.
No double recovery
30.
Compensation shall not be payable in respect of the same matter both under this Order and under any other enactment, any contract or any rule of law.
Arbitration
31.
Any difference under any provision of this Order (other than a difference which falls to be determined by the tribunal) shall be referred to and settled by a single arbitrator to be agreed between the parties or, failing agreement, to be appointed on the application of either party (after notice in writing to the other) by the President of the Institution of Civil Engineers.
Signed by authority of the Secretary of State
Ellis Harvey
Head of the Transport and Works Act Processing Unit, Department for Transport, Local Government and the Regions
27th June 2001
(3) In section 58(1) (determination of material detriment where part of house etc. proposed for compulsory acquisition), as it applies to determinations under section 8 of the 1965 Act as substituted by paragraph 5 below -
3.
- (1) The 1965 Act shall have effect with the modifications necessary to make it apply to the compulsory acquisition under this Order of a right by the creation of a new right as it applies to the compulsory acquisition under this Order of land, so that, in appropriate contexts, references in that Act to land are to be read (according to the requirements of the particular context) as referring to, or as including references to -
(2) Without prejudice to the generality of sub-paragraph (1) above, Part I of the 1965 Act shall apply in relation to the compulsory acquisition under this Order of a right by the creation of a new right with the modifications specified in the following provisions of this Schedule.
4.
For section 7 of the 1965 Act (measure of compensation) there shall be substituted the following section -
5.
For section 8 of the 1965 Act (which relates to cases in which a vendor cannot be required to sell part only of a building or garden) there shall be substituted the following -
the Railtrack (Shortlands Junction) Order 2001 ("the Order") shall, in relation to that person, cease to authorise the purchase of the right and be deemed to authorise the purchase of that person's interest in the whole of the relevant land including, where the land consists of such a park or garden, the house to which it belongs, and the notice shall be deemed to have been served in respect of that interest on such date as the tribunal directs.
(2) Any question as to the extent of the land in which the Order is deemed to authorise the purchase of an interest by virtue of subsection (1) of this section shall be determined by the tribunal.
(3) Where in consequence of a determination of the tribunal that it is satisfied as mentioned in subsection (1) of this section the Order is deemed by virtue of that subsection to authorise the purchase of an interest in land, the acquiring authority may, at any time within the period of six weeks beginning with the date of the determination, withdraw the notice to treat in consequence of which the determination was made; but nothing in this subsection prejudices any other power of the authority to withdraw the notice.".
6.
The following provisions of the 1965 Act (which state the effect of a deed poll executed in various circumstances where there is no conveyance by persons with interests in the land), that is to say -
shall be so modified as to secure that, as against persons with interests in the land which are expressed to be overridden by the deed, the right which is to be compulsorily acquired is vested absolutely in the acquiring authority.
7.
Section 11 of the 1965 Act (powers of entry) shall be so modified as to secure that, as from the date on which the acquiring authority have served notice to treat in respect of any right, they have power, exercisable in the like circumstances and subject to the like conditions, to enter for the purpose of exercising that right (which shall be deemed for this purpose to have been created on the date of service of the notice); and sections 12 (penalty for unauthorised entry) and 13 (entry on warrant in the event of obstruction) of the 1965 Act shall be modified correspondingly.
8.
Section 20 of the 1965 Act (protection for interests of tenants at will etc.) shall apply with the modifications necessary to secure that persons with such interests in land as are mentioned in that section are compensated in a manner corresponding to that in which they would be compensated on a compulsory acquisition under this Order of that land, but taking into account only the extent (if any) of such interference with such an interest as is actually caused, or likely to be caused, by the exercise of the right in question.
9.
Section 22 of the 1965 Act (protection of acquiring authority's possession where by inadvertence an estate, right or interest has not been got in) shall be so modified as to enable the acquiring authority, in circumstances corresponding to those referred to in that section, to continue to be entitled to exercise the right acquired, subject to compliance with that section as respects compensation.
(1) | (2) | (3) | (4) |
Area | Number of land shown on deposited plans | Purpose for which temporary possession may be taken | Authorised work |
London Borough of Bromley | 8 | Working site and access road (Work No. 5B) | Works Nos. 1, 1A, 2, 3, 4, 4A, 5A and 5B. |
11, 12b, 13b and 14b | Working site and access | Works Nos. 1, 1A, 3, 4 and 4A. | |
18b | Working site, access and parking | Works Nos. 1, 1A, 3, 4 and 4A |
shall be entitled to recover from Railtrack compensation in respect of expenditure reasonably incurred by him, in consequence of the removal, for the purpose of making his drain or sewer communicate with any other public sewer or with a private sewage disposal plant.
5.
The provisions of the 1990 Act mentioned in paragraph 1 above, as applied by that paragraph, shall not have effect in relation to apparatus as respects which Part III of the Street Works Act applies.
6.
In this Schedule -
(3) The provisions of Schedule 4 to this Order shall not apply in relation to apparatus to which this Part of this Schedule applies.
2.
Notwithstanding the temporary stopping up or diversion of any highway pursuant to article 10 of this Order, an undertaker shall be at liberty at all times to execute and do all such works and things in, upon or under any such highway as may be reasonably necessary or desirable to enable it to maintain or use any apparatus which at the time of the stopping up or diversion was in that highway.
3.
Notwithstanding anything in this Order or shown on the deposited plans Railtrack shall not acquire any apparatus otherwise than by agreement.
4.
- (1) If, in the exercise of the powers of this Order, Railtrack acquire any interest in any land in which any apparatus is placed, that apparatus shall not be removed under this Part of this Schedule and any right of an undertaker to maintain that apparatus in that land shall not be extinguished until alternative apparatus has been constructed and is in operation to the reasonable satisfaction of the undertaker in question.
(2) If, for the purpose of executing any works in, on or under any land purchased, held, appropriated or used under this Order, Railtrack require the removal of any apparatus placed in that land, they shall give to the undertaker in question written notice of that requirement, together with a plan and section of the work proposed, and of the proposed position of the alternative apparatus to be provided or constructed and in that case (or if in consequence of the exercise of any of the powers of this Order an undertaker reasonably needs to remove any of its apparatus) Railtrack shall, subject to sub-paragraph (3) below, afford to the undertaker the necessary facilities and rights for the construction of alternative apparatus in other land of Railtrack and thereafter for the maintenance of that apparatus.
(3) If alternative apparatus or any part of such apparatus is to be constructed elsewhere than in other land of Railtrack, or Railtrack are unable to afford such facilities and rights as are mentioned in sub-paragraph (2) above, in the land in which the alternative apparatus or part of such apparatus is to be constructed, the undertaker in question shall, on receipt of a written notice to that effect from Railtrack, forthwith use its best endeavours to obtain the necessary facilities and rights in the land in which the alternative apparatus is to be constructed.
(4) Any alternative apparatus to be constructed in land of Railtrack under this Part of this Schedule shall be constructed in such manner and in such line or situation as may be agreed between the undertaker in question and Railtrack or in default of agreement settled by arbitration pursuant to article 31.
(5) The undertaker in question shall, after the alternative apparatus to be provided or constructed has been agreed or settled by arbitration in accordance with article 31 above, and after the grant to the undertaker of any such facilities and rights as are referred to in sub-paragraph (2) or (3) above, proceed with all reasonable dispatch to construct and bring into operation the alternative apparatus and thereafter to remove any apparatus required by Railtrack to be removed under the provisions of this Part of this Schedule.
(6) Notwithstanding anything in sub-paragraph (5) above, if Railtrack give notice in writing to the undertaker in question that they desire themselves to execute any part of so much of the work necessary in connection with the construction of the alternative apparatus, or the removal of the apparatus required to be removed, as will take place in any land of Railtrack, that work, in lieu of being executed by the undertaker, shall be executed by Railtrack with all reasonable dispatch under the superintendence, if given, and to the reasonable satisfaction of the undertaker.
(7) Nothing in sub-paragraph (6) above shall authorise Railtrack to execute the placing, installation, bedding, packing, removal, connection or disconnection of any apparatus, or execute any filling around the apparatus (where the apparatus is laid in a trench) within 300 millimetres of the apparatus.
5.
- (1) Where, in accordance with the provisions of this Part of this Schedule, Railtrack afford to an undertaker facilities and rights for the construction, and maintenance, in land of Railtrack of alternative apparatus in substitution for apparatus to be removed, those facilities and rights shall be granted upon such terms and conditions as may be agreed between Railtrack and the undertaker in question or in default of agreement settled by arbitration in accordance with article 31 above.
(2) In settling those terms and conditions in respect of alternative apparatus to be constructed in or along any railway of Railtrack, the arbitrator shall -
(3) If the facilities and rights to be afforded by Railtrack in respect of any alternative apparatus, and the terms and conditions subject to which those facilities and rights are to be granted, are in the opinion of the arbitrator less favourable on the whole to the undertaker in question than the facilities and rights enjoyed by it in respect of the apparatus to be removed and the terms and conditions to which those facilities and rights are subject, the arbitrator shall make such provision for the payment of compensation by Railtrack to that undertaker as appears to him to be reasonable having regard to all the circumstances of the particular case.
6.
- (1) Not less than 28 days before commencing the execution of any works of the type referred to in paragraph 4(2) above that are near to, or will or may affect, any apparatus the removal of which has not been required by Railtrack under paragraph 4(2), Railtrack shall submit to the undertaker in question a plan, section and description of the works to be executed.
(2) Those works shall be executed only in accordance with the plan, section and description submitted under sub-paragraph (1) above and in accordance with such reasonable requirements as may be made in accordance with sub-paragraph (3) below by the undertaker for the alteration or otherwise for the protection of the apparatus, or for securing access thereto, and the undertaker shall be entitled by its officer to watch and inspect the execution of those works.
(3) Any requirements made by an undertaker under paragraph (2) above shall be made within a period of 21 days beginning with the date on which a plan, section and description under paragraph (1) above are submitted to it.
(4) If an undertaker in accordance with sub-paragraph (3) above and in consequence of the works proposed by Railtrack, reasonably require the removal of any apparatus and give written notice to Railtrack of that requirement, the foregoing provisions of this Part of this Schedule shall apply as if the removal of the apparatus had been required by Railtrack under paragraph 4(2) above.
(5) Nothing in this paragraph shall preclude Railtrack from submitting at any time or from time to time, but in no case less than 28 days before commencing the execution of any works, a new plan, section and description in lieu of the plan, section and description previously submitted, and thereupon the provisions of this paragraph shall apply to and in respect of the new plan, section and description.
(6) Railtrack shall not be required to comply with sub-paragraph (1) above in a case of emergency but in that case it shall give to the undertaker in question notice as soon as is reasonably practicable and a plan, section and description of those works as soon as reasonably practicable thereafter and shall comply with sub-paragraph (2) above in so far as is reasonably practicable in the circumstances.
7.
- (1) Subject to the following provisions of this paragraph, Railtrack shall repay to an undertaker the reasonable expenses incurred by that undertaker in, or in connection with, the inspection, removal, alteration or protection of any apparatus or the construction of any new apparatus which may be required in consequence of the execution of any such works as are referred to in paragraph 4(2) above.
(2) There shall be deducted from any sum payable under sub-paragraph (1) above the value of any apparatus removed under the provisions of this Part of this Schedule, that value being calculated after removal.
(3) If in pursuance of the provisions of this Part of this Schedule -
and the placing of apparatus of that type or capacity or of those dimensions or the placing of apparatus at that depth, as the case may be, is not agreed by Railtrack or, in default of agreement, is not determined by arbitration to be necessary, then, if such placing involves cost in the construction of works under this Part of this Schedule exceeding that which would have been involved if the apparatus placed had been of the existing type, capacity or dimensions, or at the existing depth, as the case may be, the amount which apart from this paragraph would be payable to the undertaker in question by virtue of sub-paragraph (1) above, shall be reduced by the amount of that excess.
(4) For the purposes of sub-paragraph (3) above -
(5) An amount which apart from this sub-paragraph would be payable to an undertaker in respect of works by virtue of sub-paragraph (1) above shall, if the works include the placing of apparatus provided in substitution for apparatus placed more than 7 years and 6 months earlier so as to confer on the undertaker any financial benefit by deferment of the time for renewal of the apparatus in the ordinary course, be reduced by the amount which represents that benefit.
8.
- (1) Subject to sub-paragraphs (2) and (3) below, if by reason or in consequence of the construction of any such works as are referred to in paragraph 4(2) above, any damage is caused to any apparatus (other than apparatus the repair of which is not reasonably necessary in view of its intended removal for the purposes of those works) or property of an undertaker, or there is any interruption in any service provided, or in the supply of any goods, by any undertaker, Railtrack shall -
by reason or in consequence of any such damage or interruption.
(2) Nothing in sub-paragraph (1) above shall impose any liability on Railtrack with respect to any damage or interruption to the extent that it is attributable to the act, neglect or default of an undertaker, its officers, servants, contractors or agents.
(3) An undertaker shall give Railtrack reasonable notice of any such claim or demand and no settlement or compromise shall be made without the consent of the undertaker which, if it withholds such consent, shall have the sole conduct of any settlement or compromise or of any proceedings necessary to resist the claim or demand.
9.
Nothing in this Part of this Schedule shall affect the provisions of any enactment or agreement regulating the relations between Railtrack and an undertaker in respect of any apparatus laid or erected in land belonging to Railtrack on the date on which this Order is made.
(3) The provisions of Schedule 4 to this Order shall not apply in relation to apparatus to which this Part of this Schedule applies.
2.
- (1) Before commencing the construction or renewal of any specified work, and in the case of any temporary work its removal, Railtrack shall submit to the undertaker plans for those works as described in sub-paragraph (2) below ("the plans") and shall not commence that work until the undertaker has signified in writing its approval of those plans.
(2) The plans to be submitted to the undertaker shall be detailed plans, drawings, sections and specifications describing the position and manner in which, and the level at which, any specified work is proposed to be constructed and the position of all sewers of the undertaker within 15 metres of that work or upon which the specified work will impose a load and shall include detailed drawings of every alteration which Railtrack may propose to any such sewers.
(3) For the purpose of the preparation of the plans and subject to such reasonable requirements as it may specify, the undertaker shall permit Railtrack to have access to plans in its possession and to any of its sewers.
(4) Any approval of the undertaker required under this paragraph -
(5) The undertaker may require such modifications to be made to the plans as may be reasonably necessary to secure the sewerage system of the undertaker against interference or risk of damage and to provide and secure proper and convenient means of access to any sewer.
3.
- (1) The specified work shall be constructed, and in the case of any temporary work removed, in accordance with the plans approved, or deemed to have been approved, or settled by arbitration, as the same may be amended from time to time by agreement between Railtrack and the undertaker, and in the construction or removal of the specified work Railtrack shall comply with all reasonable requirements of the undertaker and shall provide new, altered or substituted sewers or works for the protection of any sewers of the undertaker, in such manner as the undertaker may reasonably require, by way of replacement provision for or for the proper protection of, and for preventing injury or impediment to, any such sewer by reason of any specified work.
(2) All works under sub-paragraph (1) above, for the provision of new, altered or substituted sewers or the protection of any sewers of the undertaker shall, where so required by the undertaker, be constructed by the undertaker or under the supervision, if given, of an officer of the undertaker duly appointed for the purpose, and all costs, charges and expenses reasonably incurred by the undertaker in the construction of such works, or in the preparation or examination of plans or designs of such works, or in such supervision, shall be paid to the undertaker by Railtrack.
(3) When works for the provision of any such new, altered or substituted sewer, or any such protective work forming part of any such new, altered or substituted sewer or any existing sewer of the undertaker, have been completed under this Part of this Schedule to the reasonable satisfaction of the undertaker, they shall be vested in and become maintainable by the undertaker.
4.
- (1) Subject to the following provisions of this Part of this Schedule, Railtrack shall be liable to make good, or, if the undertaker so decides, to repay to the undertaker any expense reasonably incurred by the undertaker in making good, all injury or damage to any sewers, drains or works vested in the undertaker (except in so far as such sewer, drain or work is intended for alteration or removal for the purposes of the specified work) caused by or resulting from the construction of any specified work or any investigation undertaken in relation to any specified works and the provision of any new, altered or substituted sewer or any protective work under this Part of this Schedule and shall pay to the undertaker any additional expense to which it may be put in the maintenance, management or renewal or any new, altered or substituted sewer which may be necessary in consequence of the construction of any specified work.
(2) Railtrack shall indemnify the undertaker against all actions, claims, demands, costs, expenses, damages or loss which may be made on or against the undertaker which the undertaker may incur or have to pay or which it may sustain in consequence of the construction of a specified work or of the failure or want of repair of a specified work or any subsidence cause by the construction of any specified work or in consequence of any act or omission of Railtrack, their contractors, agents, workmen or servants, whilst engaged upon the specified work and any new, altered or substituted sewer or any protective work.
(3) The undertaker shall give to Railtrack reasonable notice of any such claim or demand as aforesaid and no settlement or comprise thereof shall be made without the agreement in writing of Railtrack.
(4) Nothing in sub-paragraph (1) or (2) above shall impose any liability on Railtrack in respect of any damage to the extent that it is attributable to the act, neglect or default of the undertaker, its officers, servants, or, if not Railtrack, its contractors or agents.
(5) If in pursuance of the provisions of this Part of this Schedule -
and the placing of a sewer of that type or capacity or of those dimensions or the placing of a sewer at that depth, as the case may be, is not agreed by Railtrack or, in default of agreement, is not determined by arbitration to be necessary, then, if it involves cost in the construction of works under this Part of this Schedule exceeding that which would have been involved if the sewer placed had been of the existing type, capacity or dimensions, or at the existing depth, as the case may be, the amount which apart from this paragraph would be payable to the undertaker by virtue of sub-paragraph (1) above shall be reduced by the amount of that excess.
(6) For the purposes of sub-paragraph (5) above an extension of a sewer to a length greater than the length of an existing sewer shall not be treated as a placing of a sewer of greater dimensions than those of the existing sewer.
(7) An amount which apart from this sub-paragraph would be payable to the undertaker in respect of works by virtue of sub-paragraph (1) above (and having regard, where relevant, to sub-paragraph (5) above) shall, if the works include the placing of a sewer provided in substitution for a sewer placed more than 7 years and 6 months earlier so as to confer on the undertaker any financial benefit by deferment of the time for renewal of the sewer in the ordinary course, be reduced by the amount which represents that benefit.
(8) Sub-paragraphs (1) and (5) to (7) above shall not apply where the authorised works constitute major transport works for the purposes of Part III of the Street Works Act, but instead -
5.
- (1) An officer of the undertaker duly appointed for the purpose may, at any reasonable time and, if required by Railtrack, under their supervision and control, enter upon and inspect any specified work or any other works constructed under this Part of this Schedule.
(2) The approval by the undertaker of any plans, drawings, sections or specifications or the supervision by it of any work under this Part of this Schedule shall not (if it was done without negligence on the part of the undertaker, its officers, servants, or, if not Railtrack, its contractors or agents) exonerate Railtrack from any liability or affect any claim for damages by the undertaker.
6.
Notwithstanding the temporary stopping up or diversion of any highway under the powers of article 10 of this Order, the undertaker shall be at liberty at all times to construct and do all such works and things in, upon or under any such highway as may be reasonably necessary to enable it to maintain, protect, or use any sewer which at the time of the stopping up or diversion was in that highway.
7.
As soon as reasonably practicable after the completion of the construction of the specified works, Railtrack shall deliver to the undertaker a plan and section showing the position and level of those works as constructed and all new, altered or substituted works provided under this Part of this Schedule.
[14] 1986 c. 44. A new section 7 was substituted by section 5 of the Gas Act 1995 (c. 45).back
[27] 1986 c. 44. A new section 7 was substituted by section 5 of the Gas Act 1995 (c. 45).back